[November 19, 2020] Introduction to Development Assurance Levels ARP 4754

$250.00

SKU: DG33-0339-2-1-1-1-1 Category: Tags: ,

Description

November 19, 2020

This training is a half-day introduction to Development Assurance Levels ARP 4754A for FAA certification projects. The training is intended for individuals that are new to the subject or need a better understanding of the concept from a managerial point of view. Each area of the curriculum is presented at a high level as opposed to “crunching numbers”. If you are experienced in Development Assurance Levels and ARP 4754A this training is probably not for you.

Drake web-based half-day training is intended to introduce the subjects to attendees. The training is conducted totally online with live instructors. The scheduling of the web training is East Coast 12 PM – 4 PM and West Coast 9 AM – 1 PM. This schedule allows attendees to be available at work for a half day and in training for a half day.

The training will be conducted via WebEx and can be accessed from work or at home via internet. Attendees receive log-on information after sign-up. WebEx sessions are started half an hour in advance of start time for attendee convenience. Attendees receive a PDF file of key slides ahead of time. Attendees may ask limited questions periodically during the session. Attendees receive a training certificate emailed after completion of the session.

Drake does offer private web-based training sessions for individual companies that allow for open discussion to a specific project. Drake can sign an NDA prior to this if required.

Here is a list of topics

  1. INTRODUCTION OF ARP 4754
  2. HOW TO OBTAIN ARP 4754
  3. ARP 4754 RELATIONSHIP WITH ARP 4761
  4. SCENARIOS FOR IMPLEMENTING ARP 4754
  5. RECOMMENDED DOCUMENTS FOR IMPLEMENTING ARP 4754 (PG 19)
  6. PREVIEW OF A TYPICAL SCHEDULE FOR IMPLEMENTING THE ARP 4754 DOCUMENTS
  7. OVERVIEW OF THE VALIDATION AND VERIFICATION OF THE ARP 4754 REQUIREMENTS (PG 24 & 64)
  8. THE KEY STEPS IN ARP 4754 (PG 19)
    1. Development
    2. Safety Program
    3. Requirements Management
    4. Validation
    5. Implementation Verification
    6. Configuration Management
    7. Process Assurance
    8. Certification
  9. DEVELOPMENT ASSURANCE LEVEL (DAL) (PG 44, 45, 46)
  10. APPENDIX A PROCESS OBJECTIVES, OUTPUTS, & SYSTEM CONTROL CATEGORY (PG 89 & 90)
  11. APPENDIX B SAFETY PROGRAM PLAN (PG 98)
  12. PREVIEW OF A TYPICAL SCHEDULE FOR IMPLEMENTING THE ARP 4754 DOCUMENTS
  13. SESSION CLOSEOUT AND REQUESTS

 

2020-1

Subscribe To Our Newsletter

Join our mailing list to receive the latest news and updates from The Drake Group, Inc.

You have Successfully Subscribed!